F
factoryEdge AI MACHINE MONITOR

Free OEE Tracking Software

Free for 2 CNC machines when an MTConnect endpoint is available. Basic OEE and downtime from machine state, on a Windows PC, with no credit card and no trial expiry.

By Ryan Lenhart · Updated

Free OEE software should do one job well: turn planned time, run time, ideal cycle, and good parts into availability, performance, quality, and the product of the three. The arithmetic is not the hard part. The hard part is feeding it times that match what the machine did.

FEAI Machine Monitor includes basic OEE on the free plan for 2 CNC machines. It reads those times from MTConnect when the agent publishes them, and it stores the history on your Windows PC. There is no credit card and no expiry date on that license. This page explains what that number is, when a manual tracker is enough, and when a machine connection is worth the setup. The formula itself, with a calculator you can try before any install, is on CNC OEE calculation.

Key takeaway

OEE is availability × performance × quality. A free calculator and a free machine-monitoring plan both use that formula. They do not collect the inputs the same way.

The three factors, without the slogan

Availability is run time divided by planned production time. Planned time is a decision: which breaks, meetings, and nights are inside the window. If you leave unplanned hours in the denominator, availability looks worse than the crew's work.

Performance is how fast parts were made while the machine was running, compared with an ideal cycle time. If the ideal is a wish, performance goes over 100 percent and the OEE looks magical. Set the ideal to a cycle you have actually held.

Quality is good parts divided by total parts. Most MTConnect agents do not know which parts you scrapped. Someone still records rejects, or quality stays at 100 percent and the OEE is really just availability times performance. Say that out loud when you show the number.

A worked example belongs in the calculator, not in a vendor's promise. Change one input and watch which factor moves. Then decide whether your shop's loss is stops, slow cycles, or scrap. Those are different meetings.

Two kinds of free OEE tools

KindHow time gets inStrengthWeakness
Manual tracker or spreadsheetA person types stops, counts, and hoursFast to start. No machine project. Good for one cell and a daily meetingShort stops are missed. Times are rounded. The log dies when the person is busy
Automatic clientSoftware reads machine state and part countTimeline matches the control clock. Stops under a few minutes are visibleNeeds a data source. Quality is still often manual. Setup varies by control

Public manual options we noted on 12 Nov 2026, without installing them:

Those tools are the right free start when no machine is on the network and you need the formula in tomorrow's meeting. They are a poor record of a 6-minute stop that nobody wrote down. CNC downtime tracking is the companion page for reason codes once the timeline exists.

What FEAI calculates on the free plan

For up to 2 machines that expose MTConnect:

The Shop plan ($99 per month or $990 per year for 5 machines) adds alerts and fuller analysis. Growth and above add benchmarking and cycle intelligence. The free plan is enough to see whether the OEE you have been quoting matches the machine. It is not an MES, and it does not schedule jobs.

Compatibility note. Automatic OEE in FEAI requires an accessible MTConnect agent or compatible endpoint. If part count or execution state is missing, the screen will show a partial number. That is a data limit, not a hidden paywall. Some controls need an adapter or a controller option before those items exist.

What you should set on day one

  1. Planned time. Decide the window. A 10-hour shift with a 30-minute lunch is not 24 hours, unless the machine is really scheduled overnight.
  2. Ideal cycle time for the part that actually runs. One number for a high-mix machine will lie. Update it when the job changes, or performance becomes noise.
  3. A scrap habit. Even a tally at the end of the shift is enough to stop quality from pretending to be perfect.
  4. A reason for the long stops. The software shows that the machine stopped. A person knows whether it was material, a program, inspection, or a fault. Five or six reasons are enough. Twenty reasons will not be used.

Run it for a week before you compare the score with a magazine benchmark. Job shops with short runs often sit well below the 85 percent figure quoted from Seiichi Nakajima's TPM writing. The useful comparison is this machine versus itself next month. CNC OEE software goes further on that point.

Free OEE tracking versus free machine monitoring

OEE is one report inside machine monitoring. Monitoring is the timeline: running, idle, down, program, alarms. If you only wanted the percentage, a manual tracker may be enough for a month. If you wanted to know which hour the percentage came from, you need the timeline.

Free machine monitoring software separates that shop-floor job from PC monitoring tools that show up in the same search. Free MTConnect CNC monitoring is the connection method FEAI uses, free for 2 machines.

Utilization is the simpler cousin. It ignores speed and scrap. Use the utilization calculator when the argument on the floor is "it runs all day" and the argument in the office is "we are behind." OEE is the next conversation, after utilization is no longer a guess.

When free automatic OEE is the wrong tool

A 5-day check

DayWhat you doWhat you should have
1Confirm /current returns XML. Install and activate the free license. Add one machineA live state that matches the control
2Set ideal cycle. Add the second machine if it also answersTwo timelines
3Note three long stops with a reasonA short list of reasons you will reuse
4Record scrap for the dayQuality that is not stuck at 100 percent by accident
5Read availability, performance, and quality separatelyOne factor you will work on next week

If day 1 fails, do not keep clicking refresh. Use connection diagnostics or the Demo Shop so the team can learn the screen while the endpoint is fixed.

Price after two machines

The free license does not convert itself into a subscription. Adding a third machine requires a paid plan. Shop is the first of those, at 5 machines. History already stored is kept. There is no second "OEE module" to buy inside FEAI. The metric is part of the monitoring app.

Paid cloud OEE products often price per machine per month, plus hardware. Write their rate next to $99 per month for five MTConnect machines and compare the connection method, not the brochure word "OEE." Both can print the same three letters.

Use the calculator, then the machines

Open the OEE calculator and put in last week's guesses. Then connect two real machines with Start free and see which guess was wrong. That gap is the reason to own a timeline. The install details, including the unsigned-installer warning and the 90-day claim window, are on the free CNC plan page.


FAQ

Is there free OEE software for CNC machines?

Yes. FEAI Machine Monitor includes basic OEE on the Free plan for 2 machines that expose MTConnect. Manual trackers such as spreadsheet calculators and browser logs are also free and do not read the machine.

Is OEE the same as utilization?

No. Utilization is the share of planned time the machine ran. OEE also reduces the score for slow cycles and for bad parts. OEE is equal to or lower than availability.

What do I need for automatic OEE?

Execution state and a part count from the machine, plus an ideal cycle time you set. Quality needs a count of good parts or scrap. If the agent does not publish part count, performance stays incomplete.

Does the free plan expire?

The FEAI Free plan for 2 machines has no expiry date and does not ask for a credit card. Alerts and full reporting start on the Shop plan at $99 per month for 5 machines.